A national builder bought finished lots in a Golf & Country Club Residential community located in Northern California faced a pressing challenge when they urgently needed a Final Public Report to make an upcoming closing. However, the existing Homeowners Association (HOA) had hired a Reserve Specialist to complete the annual reserve study which had been delayed. This delay was preventing the completion of the Final Public Report. To meet the closing deadline and ensure a smooth transaction, they came to us needing a full Reserve Study immediately. Despite the limited time available, we managed to complete the study within 72 hours!
As a result, we promptly provided the necessary information to the DRE, enabling the builder to obtain their Final Report for their upcoming closings and stay on track with their schedule.